Week Two
We have brought the frame together and welded the z-notch, followed by a 3/16" plate on the backside.
Here is a side shot of the frame welded back together and leveled out.
The cab has been set back in place and, prepared for newly constructed body mounts, after it is leveled.
Previous 1 2 3 Next
webmaster