Week Five

       

We want to utilize the factory gas filler cap of the 66' located on the driver side b pillar of the truck.  I removed the factory tank from behind the back seat to run a filler tube into the cab, then through the tool box in the bed, and finally down through the bed into the 06' factory gas tank.
The stock 66' transmission tunnel was no where close to working, so we formed our own with 18 gauge sheet metal.
 
We are going to make this completed transmission tunnel removable to help if there needs to be any service work to the transmission.
       